Transforming Spaces: The Installation of Altro Whiterock Hygienic Wall Cladding at Mercedes Benz Showroom Dartford
- Impact Group
- Nov 17, 2019
- 1 min read
Our in-house installation team expertly completed the Altro Whiterock installation at the Mercedes showroom in Dartford, featuring heat welded joints and thermoformed corners.
Dartford Mercedes-Benz Car Showroom Overview
The Dartford Mercedes-Benz car showroom was successfully handed over on 9th September 2019, on schedule after a 52-week programme of build.
Showroom Features
Displays 34 vehicles across two levels
Includes an external terrace with vehicular ramp access to the first floor
Workshop Facilities
Servicing and MOT facilities
Equipped with 24 hydraulic car lifts
Additional Facilities
Separate valet centre with dry and wet areas
Software diagnostic bays
Comments