top of page

Transforming Spaces: The Installation of Altro Whiterock Hygienic Wall Cladding at Mercedes Benz Showroom Dartford

Our in-house installation team expertly completed the Altro Whiterock installation at the Mercedes showroom in Dartford, featuring heat welded joints and thermoformed corners.



Dartford Mercedes-Benz Car Showroom Overview

The Dartford Mercedes-Benz car showroom was successfully handed over on 9th September 2019, on schedule after a 52-week programme of build.

Showroom Features

  • Displays 34 vehicles across two levels

  • Includes an external terrace with vehicular ramp access to the first floor

Workshop Facilities

  • Servicing and MOT facilities

  • Equipped with 24 hydraulic car lifts

Additional Facilities

  • Separate valet centre with dry and wet areas

  • Software diagnostic bays



 
 
 

Comments


bottom of page